report:prm

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
report:prm [2026/06/13 15:26] – [3.3 Cost] team1report:prm [2026/06/14 21:29] (current) – [3.3 Cost] team1
Line 5: Line 5:
 This chapter presents the project management approach adopted for the development of Screen2Green. Since the project combines hardware development, software integration, user interaction, and academic reporting within a limited timeframe, it required a management strategy capable of balancing structure with flexibility. This chapter presents the project management approach adopted for the development of Screen2Green. Since the project combines hardware development, software integration, user interaction, and academic reporting within a limited timeframe, it required a management strategy capable of balancing structure with flexibility.
  
-To address this, the team adopted a hybrid project management approach combining elements of Scrum and Waterfall. Waterfall was useful for planning around fixed academic deadlines and mandatory deliverables established by the EPS programme, while Scrum supported iterative development, continuous feedback, and adaptation to technical and organizational challenges throughout the semester. This combination was considered appropriate because the project contains both predictable elements, such as milestone submissions, and uncertain elements, such as concept refinement, prototype development, and system integration.+To address this, the team adopted a hybrid project management approach combining elements of Scrum and Waterfall. Waterfall was useful for planning around fixed academic deadlines and mandatory deliverables established by the European Project Semester (EPSprogramme, while Scrum supported iterative development, continuous feedback, and adaptation to technical and organizational challenges throughout the semester. This combination was considered appropriate because the project contains both predictable elements, such as milestone submissions, and uncertain elements, such as concept refinement, prototype development, and system integration.
  
 The chapter is organized into the main areas relevant to project management: scope, time, cost, quality, people and stakeholder management, communication, risk, procurement, and project plan. Together, these sections explain how the team structured the work, allocated responsibilities, monitored progress, and responded to challenges during the project. The chapter is organized into the main areas relevant to project management: scope, time, cost, quality, people and stakeholder management, communication, risk, procurement, and project plan. Together, these sections explain how the team structured the work, allocated responsibilities, monitored progress, and responded to challenges during the project.
Line 186: Line 186:
 <caption>Overall project cost</caption> <caption>Overall project cost</caption>
 ^ Cost category^ Description ^ Estimated cost (€) ^ ^ Cost category^ Description ^ Estimated cost (€) ^
-| Prototype materials| Electronic components, sensors, irrigation system, power supply, and prototype assembly|75.64 €|+| Prototype materials| Electronic components, sensors, irrigation system, power supply, and prototype assembly|77.79 €|
 |Personnel costs|Six team members, 1050 estimated working hours at 30 € per hour|31500 € | |Personnel costs|Six team members, 1050 estimated working hours at 30 € per hour|31500 € |
 |Marketing services|Estimated monthly marketing budget including social media advertising, content creation, influencer collaborations, university promotion, and analytics tools|1540 €| |Marketing services|Estimated monthly marketing budget including social media advertising, content creation, influencer collaborations, university promotion, and analytics tools|1540 €|
-|**Total estimated project value**| | **33115.64 €**|+|**Total estimated project value**| | **33117.79 €**|
 </table> </table>
 </WRAP> </WRAP>
Line 247: Line 247:
 For the Screen2Green project, the following stakeholders have been identified: For the Screen2Green project, the following stakeholders have been identified:
  
-  * Unordered List ItemProject Team 1: These are internal stakeholders consisting of six students from diverse technical backgrounds. They are responsible for the entire project lifecycle, including the design, assembly, and documentation of the Smart Pot system. +  * Project Team 1: These are internal stakeholders consisting of six students from diverse technical backgrounds. They are responsible for the entire project lifecycle, including the design, assembly, and documentation of the Smart Pot system.
   * ISEP Supervisors: This group of academic stakeholders provides the necessary technical framework and guidance. They are responsible for evaluating project deliverables and ensuring the project meets university standards.   * ISEP Supervisors: This group of academic stakeholders provides the necessary technical framework and guidance. They are responsible for evaluating project deliverables and ensuring the project meets university standards.
- 
   * Young Adults: This target market group consists of the primary end users. Their needs regarding screen time reduction and user experience are the main drivers for the product's functional requirements.   * Young Adults: This target market group consists of the primary end users. Their needs regarding screen time reduction and user experience are the main drivers for the product's functional requirements.
- 
   * ISEP 3D Printing: As a technical stakeholder within the university, this department is essential for the fabrication of the physical pot components. Access to these resources directly impacts the prototyping schedule.   * ISEP 3D Printing: As a technical stakeholder within the university, this department is essential for the fabrication of the physical pot components. Access to these resources directly impacts the prototyping schedule.
- 
   * YouTube Creators: These external partners are vital for the marketing strategy. They serve as influencers who build product credibility and awareness through video content and demonstrations.   * YouTube Creators: These external partners are vital for the marketing strategy. They serve as influencers who build product credibility and awareness through video content and demonstrations.
- 
   * Mauser.pt: This is the primary supplier for the project's electrical components. They provide the sensors and hardware necessary for the automatic watering system and app connectivity.   * Mauser.pt: This is the primary supplier for the project's electrical components. They provide the sensors and hardware necessary for the automatic watering system and app connectivity.
- 
   * Online Retailers: Platforms such as Amazon and Ebay are identified as distribution stakeholders. They represent the primary channels through which the product will reach a global market.   * Online Retailers: Platforms such as Amazon and Ebay are identified as distribution stakeholders. They represent the primary channels through which the product will reach a global market.
  
Line 294: Line 288:
 Manage Closely (High Power, High Interest): This category includes Team 1 and ISEP Supervisors. Communication here must be frequent and highly detailed. The team will use regular face-to-face meetings, constant messaging, and technical reports to ensure everyone is aligned.   Manage Closely (High Power, High Interest): This category includes Team 1 and ISEP Supervisors. Communication here must be frequent and highly detailed. The team will use regular face-to-face meetings, constant messaging, and technical reports to ensure everyone is aligned.  
  
-Keep Satisfied (High Power, Low Interest): This category includes the ISEP 3D Printing lab and the supplier Mauser.pt. Communication should be strictly professional, brief, and transactional. The team will only reach out when submitting precise 3D files or purchasing parts to avoid wasting their time.   +  * Keep Satisfied (High Power, Low Interest): This category includes the ISEP 3D Printing lab and the supplier Mauser.pt. Communication should be strictly professional, brief, and transactional. The team will only reach out when submitting precise 3D files or purchasing parts to avoid wasting their time.   
- +  Keep Informed (Low Power, High Interest): This category includes the target market of Young Adults and YouTube Creators. Communication needs to be engaging and visual. The team will share project updates, app teasers, and promotional videos on social media to build excitement without requiring technical involvement.   
-Keep Informed (Low Power, High Interest): This category includes the target market of Young Adults and YouTube Creators. Communication needs to be engaging and visual. The team will share project updates, app teasers, and promotional videos on social media to build excitement without requiring technical involvement.   +  Monitor (Low Power, Low Interest): This category covers Online Retailers. No direct communication is required during the prototype phase. The team will simply observe these platforms for competitor trends and pricing until the product is ready for mass distribution.
- +
-Monitor (Low Power, Low Interest): This category covers Online Retailers. No direct communication is required during the prototype phase. The team will simply observe these platforms for competitor trends and pricing until the product is ready for mass distribution.+
  
  
Line 446: Line 438:
  
 === 3.8.1 Definition === === 3.8.1 Definition ===
-Procurement Definition 
-The project requires specific hardware and materials to build a functional prototype. The following items must be purchased: 
  
-Electronic components: ESP32 board, 12 VDC valve, capacitive soil moisture sensor, DS18B20 temperature sensor, relay module, buck converter, 8W submersible pump, and power supply. These are required for the automated irrigation system prototype.+The project requires specific hardware and materials to build a functional prototype. 
 + 
 +The following items must be purchased: 
 + 
 +  * Electronic components: ESP32 board, 12 VDC valve, capacitive soil moisture sensor, DS18B20 temperature sensor, relay module, buck converter, 8W submersible pump, and power supply. These are required for the automated irrigation system prototype
 +  * Hardware fittings: A brass 1/2 inch female hose adapter to connect the pump and valve. 
 +  * Structural materials: Biodegradable PLA filament and natural cork to construct the pot and water tank.
  
-Hardware fittings: A brass 1/2 inch female hose adapter to connect the pump and valve. 
  
-Structural materials: Biodegradable PLA filament and natural cork to construct the pot and water tank. 
 === 3.8.2 Suppliers === === 3.8.2 Suppliers ===
  
  • report/prm.1781360795.txt.gz
  • Last modified: 2026/06/13 15:26
  • by team1