Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| report:prm [2026/06/13 15:26] – [3.3 Cost] team1 | report:prm [2026/06/14 21:29] (current) – [3.3 Cost] team1 | ||
|---|---|---|---|
| Line 5: | Line 5: | ||
| This chapter presents the project management approach adopted for the development of Screen2Green. Since the project combines hardware development, | This chapter presents the project management approach adopted for the development of Screen2Green. Since the project combines hardware development, | ||
| - | To address this, the team adopted a hybrid project management approach combining elements of Scrum and Waterfall. Waterfall was useful for planning around fixed academic deadlines and mandatory deliverables established by the EPS programme, while Scrum supported iterative development, | + | To address this, the team adopted a hybrid project management approach combining elements of Scrum and Waterfall. Waterfall was useful for planning around fixed academic deadlines and mandatory deliverables established by the European Project Semester (EPS) programme, while Scrum supported iterative development, |
| The chapter is organized into the main areas relevant to project management: scope, time, cost, quality, people and stakeholder management, communication, | The chapter is organized into the main areas relevant to project management: scope, time, cost, quality, people and stakeholder management, communication, | ||
| Line 186: | Line 186: | ||
| < | < | ||
| ^ Cost category^ Description ^ Estimated cost (€) ^ | ^ Cost category^ Description ^ Estimated cost (€) ^ | ||
| - | | Prototype materials| Electronic components, sensors, irrigation system, power supply, and prototype assembly|75.64 €| | + | | Prototype materials| Electronic components, sensors, irrigation system, power supply, and prototype assembly|77.79 €| |
| |Personnel costs|Six team members, 1050 estimated working hours at 30 € per hour|31500 € | | |Personnel costs|Six team members, 1050 estimated working hours at 30 € per hour|31500 € | | ||
| |Marketing services|Estimated monthly marketing budget including social media advertising, | |Marketing services|Estimated monthly marketing budget including social media advertising, | ||
| - | |**Total estimated project value**| | **33115.64 €**| | + | |**Total estimated project value**| | **33117.79 €**| |
| </ | </ | ||
| </ | </ | ||
| Line 247: | Line 247: | ||
| For the Screen2Green project, the following stakeholders have been identified: | For the Screen2Green project, the following stakeholders have been identified: | ||
| - | * Unordered List ItemProject | + | * Project |
| * ISEP Supervisors: | * ISEP Supervisors: | ||
| - | |||
| * Young Adults: This target market group consists of the primary end users. Their needs regarding screen time reduction and user experience are the main drivers for the product' | * Young Adults: This target market group consists of the primary end users. Their needs regarding screen time reduction and user experience are the main drivers for the product' | ||
| - | |||
| * ISEP 3D Printing: As a technical stakeholder within the university, this department is essential for the fabrication of the physical pot components. Access to these resources directly impacts the prototyping schedule. | * ISEP 3D Printing: As a technical stakeholder within the university, this department is essential for the fabrication of the physical pot components. Access to these resources directly impacts the prototyping schedule. | ||
| - | |||
| * YouTube Creators: These external partners are vital for the marketing strategy. They serve as influencers who build product credibility and awareness through video content and demonstrations. | * YouTube Creators: These external partners are vital for the marketing strategy. They serve as influencers who build product credibility and awareness through video content and demonstrations. | ||
| - | |||
| * Mauser.pt: This is the primary supplier for the project' | * Mauser.pt: This is the primary supplier for the project' | ||
| - | |||
| * Online Retailers: Platforms such as Amazon and Ebay are identified as distribution stakeholders. They represent the primary channels through which the product will reach a global market. | * Online Retailers: Platforms such as Amazon and Ebay are identified as distribution stakeholders. They represent the primary channels through which the product will reach a global market. | ||
| Line 294: | Line 288: | ||
| Manage Closely (High Power, High Interest): This category includes Team 1 and ISEP Supervisors. Communication here must be frequent and highly detailed. The team will use regular face-to-face meetings, constant messaging, and technical reports to ensure everyone is aligned. | Manage Closely (High Power, High Interest): This category includes Team 1 and ISEP Supervisors. Communication here must be frequent and highly detailed. The team will use regular face-to-face meetings, constant messaging, and technical reports to ensure everyone is aligned. | ||
| - | Keep Satisfied (High Power, Low Interest): This category includes the ISEP 3D Printing lab and the supplier Mauser.pt. Communication should be strictly professional, | + | * Keep Satisfied (High Power, Low Interest): This category includes the ISEP 3D Printing lab and the supplier Mauser.pt. Communication should be strictly professional, |
| - | + | | |
| - | Keep Informed (Low Power, High Interest): This category includes the target market of Young Adults and YouTube Creators. Communication needs to be engaging and visual. The team will share project updates, app teasers, and promotional videos on social media to build excitement without requiring technical involvement. | + | |
| - | + | ||
| - | Monitor (Low Power, Low Interest): This category covers Online Retailers. No direct communication is required during the prototype phase. The team will simply observe these platforms for competitor trends and pricing until the product is ready for mass distribution. | + | |
| Line 446: | Line 438: | ||
| === 3.8.1 Definition === | === 3.8.1 Definition === | ||
| - | Procurement Definition | ||
| - | The project requires specific hardware and materials to build a functional prototype. The following items must be purchased: | ||
| - | Electronic components: ESP32 board, 12 VDC valve, capacitive soil moisture sensor, DS18B20 temperature sensor, relay module, buck converter, 8W submersible pump, and power supply. These are required for the automated irrigation system prototype. | + | The project requires specific hardware and materials to build a functional prototype. |
| + | |||
| + | The following items must be purchased: | ||
| + | |||
| + | * Electronic components: ESP32 board, 12 VDC valve, capacitive soil moisture sensor, DS18B20 temperature sensor, relay module, buck converter, 8W submersible pump, and power supply. These are required for the automated irrigation system prototype. | ||
| + | * Hardware fittings: A brass 1/2 inch female hose adapter to connect the pump and valve. | ||
| + | * Structural materials: Biodegradable PLA filament and natural cork to construct the pot and water tank. | ||
| - | Hardware fittings: A brass 1/2 inch female hose adapter to connect the pump and valve. | ||
| - | Structural materials: Biodegradable PLA filament and natural cork to construct the pot and water tank. | ||
| === 3.8.2 Suppliers === | === 3.8.2 Suppliers === | ||