| Line 436: | Line 436: | ||
| === Agenda: === | === Agenda: === | ||
| - | 1. 3d print | + | 1. 3D print |
| 2. Strenght testing | 2. Strenght testing | ||
| Line 504: | Line 504: | ||
| ==== [Retrospect] 13th Presentation Meeting (2026-06-11) ==== | ==== [Retrospect] 13th Presentation Meeting (2026-06-11) ==== | ||
| + | |||
| + | === Agenda: === | ||
| + | |||
| + | 1. Component update | ||
| + | |||
| + | 2. Discussing the 3D model | ||
| + | |||
| + | 3. App updates | ||
| + | |||
| + | 4. User manual | ||
| + | |||
| + | |||
| + | === Minutes: === | ||
| + | **Prototype** | ||
| + | |||
| + | - The prototype must be adapted to accommodate the pump solution. | ||
| + | |||
| + | - The overall product concept can remain the same, but the 3D model files need to be updated. | ||
| + | |||
| + | - The bucket can be used as the water reservoir. | ||
| + | |||
| + | - Got another nozzle if needed. | ||
| + | |||
| + | - No additional coding is required for the pump. Coding will stay as is. | ||
| + | |||
| + | - Printing the updated 3D model is now the highest priority. | ||
| + | |||
| + | **Presentation** | ||
| + | |||
| + | - The team can choose which communication materials to include in the presentation. | ||
| + | |||
| + | - The presentation can be submitted on Monday instead of Saturday. | ||
| + | |||
| + | **Demo Day (25 June)** | ||
| + | |||
| + | - Each team will have its own table. | ||
| + | |||
| + | - Materials to prepare: A3 poster (check printing options with Rui), flyer, leaflet, user manual (optional, A4 if) | ||
| + | |||
| + | - Prepare food that can be eaten without cutlery. | ||
| + | |||
| + | **Next Steps** | ||
| + | |||
| + | - Finalize and print the updated 3D model. | ||
| + | |||
| + | - Test the prototype. | ||
| + | |||
| + | - Deliverables for Saturday. | ||
| + | |||
| + | - Decide on a strong closing element for the presentation that effectively showcases the project and its impact. | ||
| + | |||
| + | |||
| ===== Activities ===== | ===== Activities ===== | ||
| //Please register here all accomplished project activities// | //Please register here all accomplished project activities// | ||