Line 380: Line 380:
 4. Future focuses 4. Future focuses
  
 +=== Minutes ===
 +
 +The teacher liked both of the poster designs, so we have to talk to Anna (communication) to get a final feedback on which to choose based on what is most important. The packaging solution is better, but we can move some words to more visible places so it doesn't overlap on the drawings e.g., because that makes it more difficult to read. Also, the dimensions on the outside box doesn't necessarily match the pot itself so this needs to be revised. Other than that, our manual can be straight forward or like an IKEA-manual - it's up to us. We send the files for 3D-printing the test prototype so we can see how the components fit, and then we need to do testing in solid works, as well as a pass/fail for the smart system, and performance/load/usability for the user app. Additionally, we will have to focus on the scientific paper (due end of next week) and to write in Wiki. 
 +
 +==== [Retrospect] 11th Presentation Meeting (2026-05-28) ====
 +
 +1. Posters
 +
 +2. App update + test results
 +
 +3. Assembled circuit + test results
 +
 +4. Scientific paper
 +
 +==== [Retrospect] 12th Presentation Meeting (2026-06-03) ====
 +
 +==Agenda;==
 +  * 3d print
 +  * strenght testing
 +  * app updates
 +  * user manual
 +  * scientific paper
 +
 +
 +=== Minutes ===
 +
 +Scientific paper: 
 +
 +- Testing of the prototype: Tests we did, conditions we used, the results leading to, factors of safety, impact of that
 +
 +- Impact on latency for the app, loading
 +
 +- k6: remove this
 +
 +Video, up to 3 minutes:
 + 
 +- Use our colors
 +
 +- What it is
 +
 +- How to use
 +
 +- Why
 +
 +- The outcomes
 +
 +- The team
 +
 +Can look at the previous years and their videos. 
 +
 +Testing: 
 +
 +- Identify the load cases, impact, etc - lateral, vertical, worst scenario
 +
 +- Falls on the floor: 1m f.eg, a child kicking it f.eg.
 +
 +- Send the results to JFJ
 +
 +- Conclude with factors
 +
 +User manual: 
 +
 +- Don’t include the team members
 +
 +- The product, qr code for the wiki
 +
 +- Date is fine, commercial user manual
 +
 +- Product image: with a siluette of a human, interacting a bit or something, a human element
 +
 +- An image of the electrical has their own space
 +
 +- Watering: can do it on their own also.
 +
 +- Natural plant cycle —> estimated time limit. 3-6 months. Mention in the Wiki. Seringador —> a cultivation guide
 ===== Activities ===== ===== Activities =====
 //Please register here all accomplished project activities// //Please register here all accomplished project activities//
Line 398: Line 473:
 |15.04.26|16.04.26|Interim rehearsal|The team physically came together to rehearse the interim presentation and timing it|Entire team| |15.04.26|16.04.26|Interim rehearsal|The team physically came together to rehearse the interim presentation and timing it|Entire team|
 |16.04.26|16.04.26|Interim presentation|Present our product idea at the interim presentations|Entire team| |16.04.26|16.04.26|Interim presentation|Present our product idea at the interim presentations|Entire team|
-|19.04.26|19.04.26|Start coding project|Started the front end project and initialize the git repo|Avkaran|+|19.04.26|19.04.26|Start coding project|Started the front end project and initialized the git repo|Avkaran| 
 +|20.04.26|20.04.26|Add authentication|Added authentication in the application, allowing sign in and sign up|Avkaran|
 |24.04.26|24.04.26|Mail about water beads|Requested to hold a meeting with Cristina Ribeiro to discuss soil-replacing water beads|Hanna| |24.04.26|24.04.26|Mail about water beads|Requested to hold a meeting with Cristina Ribeiro to discuss soil-replacing water beads|Hanna|
 |26.04.26|26.04.26|Initialize back end|Initialized the Supabase back-end and activated auth functionality|Avkaran| |26.04.26|26.04.26|Initialize back end|Initialized the Supabase back-end and activated auth functionality|Avkaran|
 |30.04.26|30.04.26|Personal meeting about water beads|Hold a meeting with Cristina Ribeiro to discuss soil-replacing water beads|Entire team| |30.04.26|30.04.26|Personal meeting about water beads|Hold a meeting with Cristina Ribeiro to discuss soil-replacing water beads|Entire team|
 |07.05.26|07.05.26|Initial leaflet design|Make the first design for the leaflet|Sophie| |07.05.26|07.05.26|Initial leaflet design|Make the first design for the leaflet|Sophie|
 +|13.05.26|13.05.26|Poster & Leaflet design|Finished the design and reviewed it in class|Sophie|
 +|20.04.26|26.05.26|Complete routing in app|Added all the pages in the application (landing, social zone, profile, plant stats and focus timer)|Avkaran|
 +|22.05.26|28.05.26|App testing|Finished the required tests for the deliverable|Avkaran|