log [2026/04/16 16:59] – [Activities] team1log [2026/04/20 11:07] (current) – [[Retrospect] 7th Presentation Meeting (2026-04-23)] team1
Line 32: Line 32:
 ==== 4th Week Report ==== ==== 4th Week Report ====
 What went well: What went well:
-  * The team prepared a proper presentation and finished most of our deliverables on time.+  * The team prepared a proper presentation and finished most of the deliverables on time.
  
 What went not so well: What went not so well:
Line 74: Line 74:
   * The SWOT analysis needs to be corrected. Threats are external phenomena, so related to users and the area. Weaknesses are internal, like component failure.   * The SWOT analysis needs to be corrected. Threats are external phenomena, so related to users and the area. Weaknesses are internal, like component failure.
   * The team is mixing the words pod and pot in the report, only one can remain.   * The team is mixing the words pod and pot in the report, only one can remain.
 +
 +
 +==== 6th Week Report ====
 ===== Meetings ===== ===== Meetings =====
  
Line 228: Line 231:
  
 5. Fixed black-box diagram 5. Fixed black-box diagram
 +
 +==== [Retrospect] Interim Presentation  (2026-04-16) ====
 +
 +
 +==== [Retrospect] 7th Presentation Meeting (2026-04-23) ====
 +
 +=== Agenda ===
 +
 +1. Presentation ⇒ update on our project.
 +
 +2. Introduction to our App
 +
 +3. 3D-Model
 +
 +4. Plan for the upcoming week
 +
 +
 +
  
  
Line 247: Line 268:
 |08.04.26|09.04.26|App design|Make high-fidelity wireframe of app|Avkaran| |08.04.26|09.04.26|App design|Make high-fidelity wireframe of app|Avkaran|
 |09.04.26|09.04.26|User testing|User test the wireframe|Avkaran| |09.04.26|09.04.26|User testing|User test the wireframe|Avkaran|
-|12.04.26|12.04.26|Pre-interim team meeting|The team held a meeting to prepare for the final tasks before uploading the interim deliverables| +|12.04.26|12.04.26|Pre-interim team meeting|The team held a meeting to prepare for the final tasks before uploading the interim deliverables|Entire team
-|15.04.26|16.04.26|Interim rehearsal|The team physically came together to rehearse the interim presentation and timing it|+|15.04.26|16.04.26|Interim rehearsal|The team physically came together to rehearse the interim presentation and timing it|Entire team|
 |16.04.26|16.04.26|Interim presentation|Present our product idea at the interim presentations|Entire team| |16.04.26|16.04.26|Interim presentation|Present our product idea at the interim presentations|Entire team|