Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| log [2026/04/03 18:57] – [5th Week Report] team1 | log [2026/04/20 11:07] (current) – [[Retrospect] 7th Presentation Meeting (2026-04-23)] team1 | ||
|---|---|---|---|
| Line 32: | Line 32: | ||
| ==== 4th Week Report ==== | ==== 4th Week Report ==== | ||
| What went well: | What went well: | ||
| - | * The team prepared a proper presentation and finished most of our deliverables on time. | + | * The team prepared a proper presentation and finished most of the deliverables on time. |
| What went not so well: | What went not so well: | ||
| Line 74: | Line 74: | ||
| * The SWOT analysis needs to be corrected. Threats are external phenomena, so related to users and the area. Weaknesses are internal, like component failure. | * The SWOT analysis needs to be corrected. Threats are external phenomena, so related to users and the area. Weaknesses are internal, like component failure. | ||
| * The team is mixing the words pod and pot in the report, only one can remain. | * The team is mixing the words pod and pot in the report, only one can remain. | ||
| + | |||
| + | |||
| + | ==== 6th Week Report ==== | ||
| ===== Meetings ===== | ===== Meetings ===== | ||
| Line 228: | Line 231: | ||
| 5. Fixed black-box diagram | 5. Fixed black-box diagram | ||
| + | |||
| + | ==== [Retrospect] Interim Presentation | ||
| + | |||
| + | |||
| + | ==== [Retrospect] 7th Presentation Meeting (2026-04-23) ==== | ||
| + | |||
| + | === Agenda === | ||
| + | |||
| + | 1. Presentation ⇒ update on our project. | ||
| + | |||
| + | 2. Introduction to our App | ||
| + | |||
| + | 3. 3D-Model | ||
| + | |||
| + | 4. Plan for the upcoming week | ||
| + | |||
| + | |||
| + | |||
| Line 244: | Line 265: | ||
| |23.03.26|25.03.26|Cardboard prototype|Drawings of the product showing the inital idea|Ymke| | |23.03.26|25.03.26|Cardboard prototype|Drawings of the product showing the inital idea|Ymke| | ||
| |19.03.26|21.03.26|Organize Jira|Reorganize Jira using the correct hierarchy|Avkaran| | |19.03.26|21.03.26|Organize Jira|Reorganize Jira using the correct hierarchy|Avkaran| | ||
| + | |05.04.26|07.04.26|App research|Research similar apps for design, functionality and performance purposes|Avkaran| | ||
| + | |08.04.26|09.04.26|App design|Make high-fidelity wireframe of app|Avkaran| | ||
| + | |09.04.26|09.04.26|User testing|User test the wireframe|Avkaran| | ||
| + | |12.04.26|12.04.26|Pre-interim team meeting|The team held a meeting to prepare for the final tasks before uploading the interim deliverables|Entire team| | ||
| + | |15.04.26|16.04.26|Interim rehearsal|The team physically came together to rehearse the interim presentation and timing it|Entire team| | ||
| + | |16.04.26|16.04.26|Interim presentation|Present our product idea at the interim presentations|Entire team| | ||